Executive Brief
What leaders should ask before funding a resilience project
A practical checklist for executives, boards, and investment committees before capital is committed to a data center or critical infrastructure resilience project.
Dependency and consequence
- Has the water, energy, and OT/ICS dependency chain for this specific site been mapped, or only assessed discipline by discipline?
- What is the actual consequence of a single-point failure in each system, measured in downtime, cost, and safety, not just in a compliance rating?
- Which proposed investment addresses more than one of these three domains at once, and has that cross-system value been counted?
Water
- Has a data center water assessment or water audit been completed for this site, independent of the developer's own projections?
- What is the site's water source resilience under a drought or utility curtailment scenario?
- Does the water strategy give investors and regulators a verifiable claim, or a marketing claim?
Energy
- Is the cooling and thermal design sized against the utility's actual long-horizon capacity, not just current interconnection agreements?
- What is the backup power and critical-load strategy, and has it been tested rather than assumed?
- Is there a waste heat reuse strategy, and has it been evaluated as a revenue or regulatory opportunity rather than dismissed as unnecessary complexity?
OT/ICS cybersecurity
- Who owns OT/ICS cybersecurity risk at this site, by name, with budget authority, not just by policy?
- Has the control system environment been assessed on its own terms, or has an IT security framework simply been applied to it?
- What is the incident response plan for a control system that cannot simply be taken offline?
Community and regulatory
- Has a community risk or community impact assessment been completed before the public hearing, not in response to one?
- What is the realistic tax incentive position for this project, and has it been substantiated rather than assumed?
- What would have to be true for local opposition to escalate to a moratorium risk, and has that scenario been planned for?
Governance
- Does a single accountable owner exist for resilience across water, energy, and cybersecurity, or does the responsibility sit split across departments with no one owning the whole?
- What decision, exactly, is this funding meant to enable, and what is the cost of not making it this cycle?
Have a water, energy, or OT/ICS question about a data center site or investment?
Start a conversation